University Park Substation

This map shows the location of the project. For projects that do not have a specific location but affect a line/route or the entire system, either the affected lines/routes are shown, or an entire service area map is shown.

If you select the option to “toggle the benefit layer,” you will see an approximation of the area that will benefit from the project.

Each capital project is measured on 15 evaluation metrics to better understand its impact on the region. Learn more about the metrics and see a legend for all measures here.

Click the circled (i) information button to read a definition of each metric and hover over the image to see more about each measure.

Project programmed before 2024; Not evaluated by these metrics.

Project Description

This project will fund the design, replacement, and expansion of the University Park Substation along the Metra Electric (ME) Line. The rectifiers are several decades old, difficult to repair due to a lack of spare components, and they have long exceeded their useful life. This project is a prerequisite for additional service capacity. The project is part of an ongoing program to repair and replace components of the electrical power distribution system and will allow for additional trains to be scheduled.