Bridge Replacement Program

Evaluation Metric Measure
Access to Key Destinations i
Black line with arrows on each end

Maintains Access to Key Destinations

Click here to see more information on this capital metric and its measures.

Accessibility Improvement(s) i
Not applicable symbol

Project is not related to accessibility

Click here to see more information on this capital metric and its measures.

Asset Condition (FTA TERM Rating) i
Red gear

Asset(s) rated below 2

Click here to see more information on this capital metric and its measures.

Benefit to Riders i
One green up arrow

Moderate benefit to riders

Click here to see more information on this capital metric and its measures.

Capacity Benefit and Need i
Black line with arrows on each end

Project maintains/returns system to original capacity

Click here to see more information on this capital metric and its measures.

Climate Agency Operating Impacts i
Not applicable symbol

Project does not effect GHG emissions

Click here to see more information on this capital metric and its measures.

Economic Impact i
Three green up arrows

Large impact on economic development

Click here to see more information on this capital metric and its measures.

Equity Based on Residential Geography i
Not applicable symbol

Project is not location specific or benefits entire service area

Click here to see more information on this capital metric and its measures.

Impact on Customer and Employee Safety i
Two green up arrows

Project directly provides safety benefit/improvement

Click here to see more information on this capital metric and its measures.

Impact on Operating Cost i
One green down arrow

Decreases operating cost

Click here to see more information on this capital metric and its measures.

Impact on System Security i
Not applicable symbol

Project does not impact security

Click here to see more information on this capital metric and its measures.

Impact to Service Speed/Reliability i
One green up arrow

Moderately improves current speed/reliability

Click here to see more information on this capital metric and its measures.

Regulatory Requirements i
Green check mark

Project Meets Regulatory Requirements

Click here to see more information on this capital metric and its measures.

Ridership/Mode Shift Impacts i
Black line with arrows on each end

Maintains assets necessary for transit ridership

Click here to see more information on this capital metric and its measures.

Vehicle Useful Life i
Not applicable symbol

Asset is not a vehicle with a useful life

Click here to see more information on this capital metric and its measures.

Project Description

This on-going project will fund the preliminary engineering phase and environmental analyses as required by the National Environmental Policy Act (NEPA) for up to five proposed bridge replacement projects per year. Projects that advance to the final design and construction phases will be funded by new, location-specific project numbers as funding becomes available. Specific bridge replacement project locations are to be determined based on priority needs, annual bridge condition inspections, bridge sufficiency ratings, and the potential for bundling multiple bridge replacement projects in one construction contract procurement. The bridge replacement program is a multi-year project. Final design and construction funds have not been identified for 2024 activities that will be funded by this project.